Instrument 01 · runs in your browser
The mould loft
Assemble a new thing out of parts that already exist, see what it would be, and find out whether it is worth building at all.
The floor holds 30 parts across 7 layers — everything recorded as existing in the portfolio, and nothing invented to make the drawing look finished. Click parts to lay them down. The verdict fills in as you go.
Nothing on the floor yet. Choose parts and they are drawn at full size.
The call
Lay down parts and the verdict fills in.
No parts selected.
Four floors already laid
Each of these is an assembly one of the source documents proposes. The verdict is computed, not written.
The Case Engine as proposed
The eight parts the reconciliation says are Built or Extend. The verdict on this is the whole argument of that document.
Safe Elections on StrongRoom
The crypto layer as the decks describe it.
A new response app
The shape every DAYBREAK response app has taken so far.
The whole portfolio
All 30 parts at once. Nothing is missing — which is itself the finding.
Then check the name
A build that survives the floor still needs a name that is not already in use. That is a separate instrument with its own rules: 117 names recorded in use, 10 already rejected with a reason, 20 flagged weak, and three standing rules.